supplying the world with organic energy.
we are doing it.
Our reference plants
Plants for which we have provided support with our technology and expertise during construction or further development.
STOCKING, AUSTRIA, OESG GMBH
PLANT: Biogas plant for agricultural residues and organic waste KEY FIGURES: 500 kW electricity, conversion into biomethane production planned PROJECT: Botres is majority shareholder (70%) of the plant, currently mainly fed with agricultural residues. Plant will be...
MARIANKI, POLAND, INNOTECH SP. Z.O.O.
PLANT: Biogas plant for chicken manure from nearby farms KEY FIGURES: up to 15.000 tonnes per year, 750 kW electricity PROJECT: BOO project, finalization: 2024
NOWRA, AUSTRALIA
PLANT: Turnkey Anaerobic Biogas Plant for SSO (source separated organics) and cow manure KEY FIGURES: 35.000 t/a of food waste, 70.000 t/a of cow manure; approx. 2,2 MW electricty PROJECT: Joint Venture with Innovating Energy Australia, under construction
DURHAM, CANADA
PLANT: Turnkey Anaerobic Biogas Plant for SSO (source separated organics) PROJECT: Engineering contract for municipal biogas project. Botres is part of a consortium of Canadian environmental tech companies. Start date: 2021, finalization: 2022
IBIZA, SPAIN
PLANT: Two turnkey industrial biogas plants, one for OFMSW and SSO (Source Separated Organics) and one for sewage sludge KEY FIGURES: up to 900 Nm³ biogas; 2 MW electricity; 150 t/d of input material PROJECT: EPC project, 2 separate treatment lines, construction...
IZMIR, TURKEY
PLANT: Turnkey industrial biogas plant with high hydraulic flow for cattle and chicken manure KEY FIGURES: 1.050 Nm³ biogas/h; 2,1 MW electricity; up to 600 t/d of manure PROJECT: EPC project, construction start: May 2019, commissioning: Q1 2020
BILECIK, TURKEY
PLANT: Turnkey biogas plant for OFMSW: Organic waste recovery using Botres’ Bio-Scraper and industrial anaerobic digestion plant with hygienisation and biogas treatment/desulphurisation KEY FIGURES: Up to 1,300 m³ biogas/h; up to 3 MW electricity PROJECT: EPC project;...
ANKARA, TURKEY
PLANT: Turnkey industrial biogas plant with high hydraulic flow KEY FIGURES: 2,1 MW electricity; up to 600 t/d cattle slurry PROJECT: EPC project, construction start: February 2018, commissioning: October 2018
Polatli, Turkey
PLANT: Industrial biogas plant KEY FIGURES: Up to 400 t/d cow manure, chicken litter and agricultural residues; 1,4 MW electricity PROJECT: Start construction: 2014, spring 2018 expansion to 2,8 MWel with up to 900 t/d agricultural residues, mainly cattle manure,...